Grade is the rise divided by the run, times 100: a road climbing 8 m over 100 m of map distance has a grade of 8 %. Percentage and degrees are the same slope told two ways — 8 % is 4.57°, and 100 % is not vertical but 45°, where rise and run are equal.

Worked examples

How it's calculated

grade % = (rise ÷ run) × 100

  1. StepMeasure the vertical rise, and enter it as a negative number for a descent.
  2. StepMeasure the horizontal run — the map distance, not the length of the road surface.
  3. ResultDivide rise by run and multiply by 100; both lengths must use the same unit.

Reference table

Rise, runSame slope as an angleGrade
0, 1000°, level0
5, 1002.86°5
8, 1004.57°8
12, 1006.84°12
41, 10022.29°, San Francisco's steepest block41
50, 10026.57°50
100, 10045°, where rise equals run100
-8, 100-4.57°, a descent-8

Questions

How do I calculate road grade?

Divide the vertical rise by the horizontal run and multiply by 100: grade % = (rise ÷ run) × 100. A road that rises 8 m over 100 m of horizontal run has a grade of 8 %. The same slope as an angle is arctan(8 ÷ 100) = 4.57°.

What is the difference between grade percentage and degrees?

They describe the same slope two ways. The percentage is the rise-over-run ratio times 100, so 8 % means 8 m of rise per 100 m of run; the angle is arctan of that same ratio. A 100 % grade is 45°, not vertical, because at 45° the rise equals the run.

What counts as a steep road grade?

There is no single threshold, but the scale helps: 5 % is a gentle climb, 12 % already reads as steep. Ten blocks of public street in San Francisco exceed 30 %, and the steepest of them reaches 41 %. Even those stay below 100 %, which is 45° and not vertical at all.

What are rise and run?

The rise is the change in height and the run is the horizontal distance covered — not the length of the sloped surface itself. Use the same length unit for both; because the grade is a ratio, the unit cancels and the result is unit-free.

Can the grade be negative?

Yes. A negative rise means the road drops instead of climbing, which gives a negative grade and a negative angle. A rise of -8 m over a 100 m run is a grade of -8 % and an angle of -4.57°.