- Slab length
- 3m
- Slab width
- 2m
- Slab thickness
- 10cm
- Yield per bag
- 0.009m³
67bags
Open with these values67bags
Result: 67 bagsLength × width × thickness is the volume; the volume divided by one bag's yield is the bag count, always rounded up to a whole bag. A 3 × 2 m slab at 10 cm holds 0.6 m³ — 67 bags at 0.009 m³ each. Past roughly half a cubic metre, ready-mix by the cubic metre beats carrying bags.
67bags
Open with these values164bags
Open with these values23bags
Open with these valuesbags = ⌈length × width × thickness ÷ yield per bag⌉
The count assumes a perfect rectangle and no waste. An uneven base and spillage both eat mix, so around 5 to 10 % on top is the honest order.
A 3 × 2 m slab at 10 cm holds 0.6 m³, which is 66.7 bags at 0.009 m³ each. The formula rounds that up to 67, because half a bag is not for sale.
Bagged pre-mix suits small pours up to roughly 0.5 m³. Beyond that the bag count climbs fast and hand-mixing gets heavy, and ready-mix by the cubic metre is usually cheaper and more consistent.
The slab is 0.6 m³, so 0.6 m³ of mix is what I need.
That is the volume of a perfect rectangle with nothing spilt. Spillage and an uneven base take more, and concrete sets fast enough that a second trip mid-pour is not an option.
I entered the slab thickness in metres.
Thickness is in centimetres here while length and width are in metres. Enter 10 for a 10 cm slab, not 0.1.
Every bag yields the 0.009 m³ the calculator starts with.
Yield follows the bag size and the mix, and it is printed on the bag. The data sheet behind this calculator puts a 27.2 kg bag at 12.7 litres and a 36.2 kg bag at 17 litres.
| Length, width, thickness, yield | Volume | Bags |
|---|---|---|
| 1, 1, 10, 0.009 | 0.1 m³ | 12 |
| 2, 2, 5, 0.009 | 0.2 m³ | 23 |
| 3, 2, 10, 0.009 | 0.6 m³ | 67 |
| 4, 3, 15, 0.011 | 1.8 m³ | 164 |
| 6, 4, 10, 0.0125 | 2.4 m³ | 192 |
Multiply length by width by thickness in metres for the volume, then divide by the yield of one bag. A 3 × 2 m slab at 10 cm deep is 0.6 m³; at 0.009 m³ per bag that is 67 bags.
It depends on the load. A garden path or patio is usually around 10 cm, a shed base or driveway 10–15 cm, and a load-bearing footing more again. Check the local building requirements for anything structural.
A 20 kg pre-mix bag yields roughly 0.009 m³ of mixed concrete, and that is the default here. The Quikrete data sheet behind this calculator puts a 27.2 kg bag at 12.7 litres, so the figure follows the bag size and the mix. Use the volume printed on your own bag when you have it.
It comes down to volume. Bagged pre-mix suits small pours up to roughly 0.5 m³; past that the bag count climbs fast and mixing by hand gets heavy. Ready-mix delivered by the cubic metre is usually cheaper and more consistent for larger jobs.
Yes. The count already rounds up to whole bags, but it still assumes a perfect rectangle and no waste. Around 5–10 % more covers spillage and an uneven base — concrete sets fast and a second trip mid-pour is not an option.
Information, not professional advice.